Search
Filters
Close

Thirty Days to Coat a Bridge - How a Contractor met a Short Deadline, Reduced Project Coasts Through Energy-Efficient Air Treatment Equipment

Desiccant dehumidification technology has transformed itself into a sophisticated and mainstream method that is used in many blasting and coating applications today. Utilizing temporary dehumidification and remote monitoring equipment for a blast and coating operation for the Onslow Beach Bridge allowed the project to be completed in 30 days – twice as fast as is typical for the type of project. This paper also will discuss how a contractor realized significant fuel savings due to the use of energy-efficient equipment.

Product Number: 41209-518-SG
Author: Dave Wikoff
Publication Date: 2009
Industry: Coatings
$0.00
$20.00
$20.00

Desiccant dehumidification technology has transformed itself into a sophisticated and mainstream method that is used in many blasting and coating applications today. Utilizing temporary dehumidification and remote monitoring equipment for a blast and coating operation for the Onslow Beach Bridge allowed the project to be completed in 30 days – twice as fast as is typical for the type of project. This paper also will discuss how a contractor realized significant fuel savings due to the use of energy-efficient equipment.

Desiccant dehumidification technology has transformed itself into a sophisticated and mainstream method that is used in many blasting and coating applications today. Utilizing temporary dehumidification and remote monitoring equipment for a blast and coating operation for the Onslow Beach Bridge allowed the project to be completed in 30 days – twice as fast as is typical for the type of project. This paper also will discuss how a contractor realized significant fuel savings due to the use of energy-efficient equipment.

Also Purchased