Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Triangle of Trust Client Driven Specifications for Wastewater Facilities

Through the course of any project, communication is the key element for success. In the coatings industry, a lack of communication by project stakeholders can show up in a very short time following project completion. This can be in the form of premature failures, shorter equipment service life, etc. We have found that this gap in communication often exists on the planning and implementation side of wastewater treatment projects. As professionals we have a tendency to hear, but not listen.

Product Number: 41214-874-SG
Author: Joe Cesarek, Dan Zienty
Publication Date: 2014
Industry: Coatings
$0.00
$20.00
$20.00

Through the course of any project, communication is the key element for success. In the coatings industry, a lack of communication by project stakeholders can show up in a very short time following project completion. This can be in the form of premature failures, shorter equipment service life, etc. We have found that this gap in communication often exists on the planning and implementation side of wastewater treatment projects. As professionals we have a tendency to hear, but not listen.

Through the course of any project, communication is the key element for success. In the coatings industry, a lack of communication by project stakeholders can show up in a very short time following project completion. This can be in the form of premature failures, shorter equipment service life, etc. We have found that this gap in communication often exists on the planning and implementation side of wastewater treatment projects. As professionals we have a tendency to hear, but not listen.

Also Purchased
Picture for Time-To-Corrosion Initiation of Chloride Exposed Reinforced Concrete Considering Time Dependence of
Available for download

Time-To-Corrosion Initiation of Chloride Exposed Reinforced Concrete Considering Time Dependence of the Diffusion Coefficient

Product Number: 51314-3637-SG
ISBN: 3637 2014 CP
Author: William Hartt
Publication Date: 2014
$0.00
Picture for Increasing the Lifetime of J55 Tubing by Improving Steel Metallurgy—Lab and Field Test Achievements
Available for download

51313-02141-Increasing the Lifetime of J55 Tubing by Improving Steel Metallurgy—Lab and Field Test Achievements

Product Number: 51313-02141-SG
ISBN: 02141 2013 CP
Author: Mariana Salcu
Publication Date: 2013
$20.00
Picture for 98742 HIGH TEMPERATURE CORROSION PERFORMANCE
Available for download

98742 HIGH TEMPERATURE CORROSION PERFORMANCE OF AUTOMOTIVE COUPLING ALLOYS

Product Number: 51300-98742-SG
ISBN: 98742 1998 CP
Author: G. D. Smith, J. R. Crum, H. L. Flower
$20.00