Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

Pipings’ Kryptonite: Understanding Repair Options for Piping with Section Loss

The sheer volume of piping systems, both insulated and non-insulated, is daunting. Companies, in order to deal with limited inspection resources, have resorted to risk-based strategies in order to prioritize inspection of such systems. By the time surfaces and systems are inspected, they often exhibit wall loss, or pitting corrosion on surfaces. Piping is only as strong as the wall thickness of the original design. When corrosion reduces wall thickness to a minimum required thickness for the given pressure, actions must be taken.

Product Number: 41216-973-SG
Author: David A. Hunter
Publication Date: 2016
$0.00
$20.00
$20.00

The sheer volume of piping systems, both insulated and non-insulated, is daunting. Companies, in order to deal with limited inspection resources, have resorted to risk-based strategies in order to prioritize inspection of such systems. By the time surfaces and systems are inspected, they often exhibit wall loss, or pitting corrosion on surfaces. Piping is only as strong as the wall thickness of the original design. When corrosion reduces wall thickness to a minimum required thickness for the given pressure, actions must be taken. This paper discusses the ASME B31.3 Process Piping requirement for tmin considerations, and the ASME Post Construction Committee 2 (ASME PCC-2-2015) standard for repairs, which includes an engineered composite repair system as an allowable method for strengthening piping.

The sheer volume of piping systems, both insulated and non-insulated, is daunting. Companies, in order to deal with limited inspection resources, have resorted to risk-based strategies in order to prioritize inspection of such systems. By the time surfaces and systems are inspected, they often exhibit wall loss, or pitting corrosion on surfaces. Piping is only as strong as the wall thickness of the original design. When corrosion reduces wall thickness to a minimum required thickness for the given pressure, actions must be taken. This paper discusses the ASME B31.3 Process Piping requirement for tmin considerations, and the ASME Post Construction Committee 2 (ASME PCC-2-2015) standard for repairs, which includes an engineered composite repair system as an allowable method for strengthening piping.

Also Purchased
Picture for 01637 RECURRENT ULTRASOUND IN-LINE INSPECTION
Available for download

01637 RECURRENT ULTRASOUND IN-LINE INSPECTION OF TRANSMISSION PIPELINES AND THE SIGNIFICANCE OF METAL LOSS GROWTH

Product Number: 51300-01637-SG
ISBN: 01637 2001 CP
Author: William H. Brown
$20.00
Picture for 96586 DOCUMENTATION OF INJECTION POINTS IN
Available for download

96586 DOCUMENTATION OF INJECTION POINTS IN REFINERY PIPING

Product Number: 51300-96586-SG
ISBN: 96586 1996 CP
Author: H. Lee Craig, Jr., William C. Fort, Raymond A. Stephenson
$20.00