Search
Filters
Close

51313-02395-Asset Integrity Management System—Why You Need This?

Product Number: 51313-02395-SG
ISBN: 02395 2013 CP
Author: Gobind Khiani
Publication Date: 2013
$0.00
$20.00
$20.00

As North American oil and gas infrastructure ages changes have been made to facilities during their life time which may not have been transferred to the official record drawings of the facilities. Government regulations have also changed during the life of the facilities rendering some system components noncompliant.

Forward thinking user companies have decided to review facilities and correct any deficiencies to record drawings to ensure that record drawings reflect the actual facility and to perform a Process Hazards Analysis (PHA) on the facilities to identify potential hazards and/or operability problems.

The PHAs produced a list of recommendations that are required to be acted upon to resolve the issues in the recommendations. The studies indicate that significant deficiencies exist at older facilities and that repairs and/or modifications are required. Significant cost is associated with the drawing updates PHA process and recommendation resolution.
 

As North American oil and gas infrastructure ages changes have been made to facilities during their life time which may not have been transferred to the official record drawings of the facilities. Government regulations have also changed during the life of the facilities rendering some system components noncompliant.

Forward thinking user companies have decided to review facilities and correct any deficiencies to record drawings to ensure that record drawings reflect the actual facility and to perform a Process Hazards Analysis (PHA) on the facilities to identify potential hazards and/or operability problems.

The PHAs produced a list of recommendations that are required to be acted upon to resolve the issues in the recommendations. The studies indicate that significant deficiencies exist at older facilities and that repairs and/or modifications are required. Significant cost is associated with the drawing updates PHA process and recommendation resolution.
 

Product tags
Also Purchased
Picture for The Value of Internal Corrosion Monitoring Activities in Asset Integrity Management
Available for download

51313-02223-The Value of Internal Corrosion Monitoring Activities in Asset Integrity Management

Product Number: 51313-02223-SG
ISBN: 02223 2013 CP
Author: Amer Jarragh
Publication Date: 2013
$20.00
Picture for 11126 Direct Assessment Pipeline Integrity Management
Available for download

11126 Direct Assessment Pipeline Integrity Management

Product Number: 51300-11126-SG
ISBN: 2011 11126 CP
Author: Asokan P. Pillai
Publication Date: 2011
$20.00