A study of alternating current (AC) interference on cathodically protected pipeline from railway electrification systems was conducted with a continuous data logger developed specifically for the purpose.
A study of alternating current (AC) interference on cathodically protected pipeline from railway electrification systems was conducted. A continuous data logger capable of measuring the pipe to soil potential at a sampling interval of 1.25s was developed specifically for the purpose. The study was carried out in a 51mm diameter underground pipeline running parallel to the rail line for a distance of nearly 150m. The data logger was placed securely inside a test link post (TLP) with its positive terminal connected to the pipe and the negative terminal to the copper sulfate reference electrode (CSE) buried underground. A maximum of 33 Vrms and a minimum of 5 Vrms were found to be induced in the pipeline when the rail was energized. These measures help us to assess the risk of corrosion and mitigation measures to be implemented, thereby contributing to sustainable corrosion prevention. The present paper presents the scheme of the experimental system, important aspects of the instrumentation part and the major results, along with the author’s plan for future studies.
Keywords: Alternating Current Interference, safety, touch voltage, step voltage, AC mitigation, Cathodic Protection, Data Loggers, right of way (ROW), copper sulfate reference electrode (CSE).
Concerns related to stray DC interference. Including safety, testing, documentation and lessons learned. Also addressed are DC powered transit systems and other unordinary sources of DC interference.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
CP Interference and CP Influence and how the two differ. Both will be demonstrated by case histories and some solutions will be presented.
Challenges associated with coordinating the modelling, design, and installation of an alternating current interference and mitigation systems. The project consisted of a 65 kilometer long double circuit 500 kilovolt (kV) overhead transmission in a heavily congested right-of-way corridor with more than 80 pipelines.