Save 20% on select titles with code HIDDEN24 - Shop The Sale Now
A study of alternating current (AC) interference on cathodically protected pipeline from railway electrification systems was conducted with a continuous data logger developed specifically for the purpose.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
A large diameter, 1067 mm (42 in) and 914 mm (36 in), high pressure gas mainline, and four (4) smaller diameter lateral pipelines, between 406 mm (16 in) and 610 mm (24 in), were constructed in Alberta, Canada, between 1999 and 2000. At the time of construction, the pipelines were built in proximity to several high voltage alternating current (HVAC) transmission lines. In subsequent years, additional transmission lines were built near the pipeline system, bringing the total number of lines with significant proximity to eight (8).