A replacement girth weld in a wet, sour gas gathering pipeline failed within 72 hours of start of operation. This paper describes the investigation of this unusual failure, indicates probable causes, and outlines potential changes in repair/replacement practices for wet, sour gas lines. Keywords: pipeline, sour gas, sulfide stress cracking, welding, failure analysis, repair welding