Observations and guidelines to conduct hydrostatic pressure tests of pipelines and/or process equipment.  Concerns for hydrostatic pressure tests relate to the water itself, including any suspended solids, dissolved oxygen, or any Sulfate Reducing Bacteria (SRB) or Acid Producing Bacteria (APB) present in the test water.

Product Number: 51300-11082-SG
ISBN: 11082 2011 CP
Author: Daniel E. Powell, Burkin Melancon and Robert H. Winters
Publication Date: 2011
$0.00
$20.00
$20.00

This paper presents observations and guidelines associated with conducting hydrostatic pressure tests of pipelines and/or process equipment, such as vessels. The potential concerns for hydrostatic pressure tests relate to the water itself, including any suspended solids, dissolved oxygen, or any Sulfate Reducing Bacteria (SRB) or Acid Producing Bacteria (APB) that may be present in the test water. Recommendations of several major crude oil and natural gas producers, pipeline companies, chemical suppliers and service companies have been reviewed, including “best practices.” Hydrostatic pressure test water should be completely removed from the system within 28 days, including any small remnants of water from low spots or deadlegs. However, if the period of time following the introduction of the test water and the beginning of operations exceeds 28 days, then it would be appropriate for a “dry” or “wet” lay-up in order to preserve the integrity of the base metals and prevent internal corrosion. This paper presents general observations and recommendations related to “dry” and “wet” lay-ups, including filtration requirements and specific treatments for oxygen scavengers, biocides, and corrosion inhibitors.

Keywords: Hydrostatic, Pressure Test, biocide, glutaraldehyde, THPS, Sulfate Reducing Bacteria, SRB, corrosion inhibitor, oxygen scavenger, ammonium bisulfite, ABS, pickling, wet lay-up, dry lay-up, dwell time

This paper presents observations and guidelines associated with conducting hydrostatic pressure tests of pipelines and/or process equipment, such as vessels. The potential concerns for hydrostatic pressure tests relate to the water itself, including any suspended solids, dissolved oxygen, or any Sulfate Reducing Bacteria (SRB) or Acid Producing Bacteria (APB) that may be present in the test water. Recommendations of several major crude oil and natural gas producers, pipeline companies, chemical suppliers and service companies have been reviewed, including “best practices.” Hydrostatic pressure test water should be completely removed from the system within 28 days, including any small remnants of water from low spots or deadlegs. However, if the period of time following the introduction of the test water and the beginning of operations exceeds 28 days, then it would be appropriate for a “dry” or “wet” lay-up in order to preserve the integrity of the base metals and prevent internal corrosion. This paper presents general observations and recommendations related to “dry” and “wet” lay-ups, including filtration requirements and specific treatments for oxygen scavengers, biocides, and corrosion inhibitors.

Keywords: Hydrostatic, Pressure Test, biocide, glutaraldehyde, THPS, Sulfate Reducing Bacteria, SRB, corrosion inhibitor, oxygen scavenger, ammonium bisulfite, ABS, pickling, wet lay-up, dry lay-up, dwell time

Also Purchased
Picture for 11032 New Development of a High Tg FBE Coating
Available for download
Picture for 11120 Sulfur Corrosion Due To Oxygen Ingress
Available for download

11120 Sulfur Corrosion Due To Oxygen Ingress

Product Number: 51300-11120-SG
ISBN: 2011 11120 CP
Author: Joseph Boivin and Scott Oliphant
Publication Date: 2011
$20.00