Search
Filters
Close

10403 Subsea SCR/Flowline Preservation-Maintenance of Fill Fluids During the Thunder Horse Subsea Kit Re-installation Campaign

Product Number: 51300-10403-SG
ISBN: 10403 2010 CP
Author: Jeffrey Willmon
Publication Date: 2010
$0.00
$20.00
$20.00
This paper will summarize the activities undertaken by the Thunder Horse Sub-sea Team in the maintenance of the hydrotest-fill fluids for the sub-sea production flow-line/equipment from initial fill until start-up.

Discussed will be: • The initial fill of the Thunder Horse sub-sea system with chemically treated water and how this treatment aligned with BP and MMS/EPA requirements.

• The position that the project team took as related to the continued effectiveness of the chemically treated fill fluids, particularly with respect to the degradation of the biocide product (THPS) and its ability to mitigate the effects of microbial influenced corrosion (MIC), over extended periods leading to production start-up.

• The activities performed by the Thunder Horse project team to maintain the recommended chemical concentrations in the sub-sea system during construction activities.

Key Words: Hydrotest, THPS, MIC
This paper will summarize the activities undertaken by the Thunder Horse Sub-sea Team in the maintenance of the hydrotest-fill fluids for the sub-sea production flow-line/equipment from initial fill until start-up.

Discussed will be: • The initial fill of the Thunder Horse sub-sea system with chemically treated water and how this treatment aligned with BP and MMS/EPA requirements.

• The position that the project team took as related to the continued effectiveness of the chemically treated fill fluids, particularly with respect to the degradation of the biocide product (THPS) and its ability to mitigate the effects of microbial influenced corrosion (MIC), over extended periods leading to production start-up.

• The activities performed by the Thunder Horse project team to maintain the recommended chemical concentrations in the sub-sea system during construction activities.

Key Words: Hydrotest, THPS, MIC
Product tags
Also Purchased
Picture for 10404 Protection Against Microbiologically Influenced Corrosion by Effective Treatment
Available for download

10404 Protection Against Microbiologically Influenced Corrosion by Effective Treatment and Monitoring During Hydrotest Shut-In

Product Number: 51300-10404-SG
ISBN: 10404 2010 CP
Author: Joseph E. Penkala, Jennifer Fichter, and
Publication Date: 2010
$20.00
Picture for 10401 Prevention of Corrosion in Carbon Steel Pipelines Containing Hydrotest Water
Available for download

10401 Prevention of Corrosion in Carbon Steel Pipelines Containing Hydrotest Water-An Overview

Product Number: 51300-10401-SG
ISBN: 10401 2010 CP
Author: Adam Darwin, Karthik Annadorai and Krista Heidersbach
Publication Date: 2010
$20.00