It was necessary to retrofit induced AC mitigation on a newly installed 30 inch natural gas pipeline due to an inadequate pre-construction study. This paper presents details of the study and of the novel mitigation approach taken.
Keywords: grounding grid, HVAC, induced AC, induced AC mitigation, point ground, transferred potential.