Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

SRU Reaction Furnace Waste Heat Boiler Tube Failure Causing Unscheduled Shutdown

A sulfur recovery unit (SRU) train in a gas processing facility went under an emergency shutdown due to the failure of a reaction furnace waste heat boiler (WHB) tube. The failed tube had been in service for approximately 18 years. The failed tube was subjected to a number of metallurgical laboratory examinations in order to determine the damage mechanism and root cause(s) of the failure. Examinations included visual inspection, scale analysis, chemical analysis, metallographic examination and mechanical testing. The examination revealed internal corrosion thinning in the tube which led to rupture since the tube could no longer withstand the pressure. Metallographic examination revealed spheroidized microstructure indicating that the tube experienced high metal temperature. This is suggesting that something was impeding heat transfer between the tube and water. Scale analysis results from a sample collected from the tube internal surface indicated the presence of iron sulfide corrosion products. Based on the aforementioned findings, it was concluded that the corrosion thinning was caused by sulfidation. Sulfidation is one of the potential damage mechanisms in WHB tubes and is caused by reactive sulfur species as a result of the thermal decomposition of sulfur compounds at high temperatures (above 500oF). Failure contributing factors as well as corrective actions to prevent recurrence of such failure are discussed in this paper.

Product Number: MPWT19-14391
Author: Qasem J. Al-Hassan, Iyad A. Al-Buraiki
Publication Date: 2019
$0.00
$0.00
$0.00
Also Purchased
Picture for 07455 Case Studies of Waste Heat Boiler Failure in Refineries
Available for download

07455 Case Studies of Waste Heat Boiler Failure in Refineries

Product Number: 51300-07455-SG
ISBN: 07455 2007 CP
Author: Hongwei Wang, Deyuan Fan, and William R. Coyle
Publication Date: 2007
$20.00
Picture for 08436 Boiler Tube Failures and Integrity Assessment
Available for download

08436 Boiler Tube Failures and Integrity Assessment

Product Number: 51300-08436-SG
ISBN: 08436 2008 CP
Author: Mohamed A. Saleem and Abdulwahab Hulaibi
Publication Date: 2008
$20.00
Picture for 96544 SOME COMMON CORROSION MECHANISMS LEADING
Available for download

96544 SOME COMMON CORROSION MECHANISMS LEADING TO BOILER TUBE FAILURE

Product Number: 51300-96544-SG
ISBN: 96544 1996 CP
Author: D. I. Bain, J. D. Haff, J. A. Kelly
$20.00