Save 20% on select titles with code HIDDEN24 - Shop The Sale Now
Variables that influence extent of vaporization of injected wash water & subsequent impact on minimizing the risk of corrosion. Consequences of liquid maldistribution in reactor effluent air coolers (REACs). Selecting between single and multiple injection points.
We are unable to complete this action. Please try again at a later time.
If this error continues to occur, please contact AMPP Customer Support for assistance.
Error Message:
Please login to use Standards Credits*
* AMPP Members receive Standards Credits in order to redeem eligible Standards and Reports in the Store
You are not a Member.
AMPP Members enjoy many benefits, including Standards Credits which can be used to redeem eligible Standards and Reports in the Store.
You can visit the Membership Page to learn about the benefits of membership.
You have previously purchased this item.
Go to Downloadable Products in your AMPP Store profile to find this item.
You do not have sufficient Standards Credits to claim this item.
Click on 'ADD TO CART' to purchase this item.
Your Standards Credit(s)
1
Remaining Credits
0
Please review your transaction.
Click on 'REDEEM' to use your Standards Credits to claim this item.
You have successfully redeemed:
Go to Downloadable Products in your AMPP Store Profile to find and download this item.
Continuous wash water injection in gas recovery units (GRU) is a best practice for corrosion control. The case study describes failures that occurred in the wash water injection system.
Oil and gas production from highly saline reservoirs can present challenges to the completion materials. The most saline fields often require downhole injection of (low chloride) wash water to dilute the produced water and mitigate the threat of halite precipitation on the production tubulars. The present paper investigates the threats associated with the co-mingled wash water and production fluids with respect to common completion materials.