Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

51312-01372-Port Zayed Concrete Rehabilitaion

Product Number: 51312-01372-SG
ISBN: 01372 2012 CP
Author: Akram Saad
Publication Date: 2012
$0.00
$20.00
$20.00
Mina Port Zayed is located in the Island of Abu Dhabi the capital city of the United Arab Emirates which meets the shorelines of the Arabian Gulf. The rehabilitation project initiated for the replacement of the concrete fenders for berths 14 to 21(Berth 19 was by in-situ repair method) of the Mina Zayed Port. This was a major concrete repair and rehabilitation project performed for the Public Works Department of Abu Dhabi. The original scope of the project consisted in removal and replacement of the existing precast panels for the Berths frontage install new precast panels install all cylindrical type fenders install stainless steel ladders to replace existing galvanized ladders replace cope edge timber with new and paint bollards.
Mina Port Zayed is located in the Island of Abu Dhabi the capital city of the United Arab Emirates which meets the shorelines of the Arabian Gulf. The rehabilitation project initiated for the replacement of the concrete fenders for berths 14 to 21(Berth 19 was by in-situ repair method) of the Mina Zayed Port. This was a major concrete repair and rehabilitation project performed for the Public Works Department of Abu Dhabi. The original scope of the project consisted in removal and replacement of the existing precast panels for the Berths frontage install new precast panels install all cylindrical type fenders install stainless steel ladders to replace existing galvanized ladders replace cope edge timber with new and paint bollards.
Product tags
Also Purchased
Picture for Analysis of Metro Stray current Interference on Underground Pipelines with a SACP system by Field Te
Available for download

51312-01370-Analysis of Metro Stray current Interference on Underground Pipelines with a SACP system by Field Te

Product Number: 51312-01370-SG
ISBN: 01370 2012 CP
Author: Liang Dong
Publication Date: 2012
$20.00
Picture for Inhibitor-Testing by a new High Superficial Velocity Flow-Loop System
Available for download

51312-01368-Inhibitor-Testing by a new High Superficial Velocity Flow-Loop System

Product Number: 51312-01368-SG
ISBN: 01368 2012 CP
Author: Thomas Vogl
Publication Date: 2012
$20.00
Picture for Modeling and Prediction of the Corrosion of Onshore Well Casings
Available for download

51312-01378-Modeling and Prediction of the Corrosion of Onshore Well Casings

Product Number: 51312-01378-SG
ISBN: 01378 2012 CP
Author: Liane Smith
Publication Date: 2012
$20.00