Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Use GIVING24 at checkout to save 20% on eCourses and books (some exclusions apply)!

51314-4437-Overcoming Inspection Challenges with EMAT Robotic ILI Tools

Product Number: 51314-4437-SG
ISBN: 4437 2014 CP
Author: Aaron Huber
Publication Date: 2014
$0.00
$20.00
$20.00
Diakont’s US-based pipeline services group recently completed multiple inspection jobs for a western-US natural gas pipeline operator.  The sections of line required reassessment as part of the operator’s ICDA program.  For multiple reasons the lines were deemed unpiggable which necessitated the use of robotic ILI tools rather than flow-driven pigs.A video-crawler inspection conducted by the operator discovered a possible indication of internal corrosion at a low point in the line.  A neighboring line had dense internal buildup too extensive to rely upon a visual-only inspection.  Due to these preliminary findings the operator made the decision to have Diakont perform a comprehensive in-line inspection using their robotic EMAT tools and to extend the scope of the inspection beyond the original plan.Diakont conducted a high-resolution internal examination of the pipe sections using the tool’s non-contact EMAT probes.  The EMAT scan of the indication did confirm some wall loss in one of the pipe sections however it was measured to be at a minimal depth so a drip line was installed and the pipeline was returned to service.By utilizing robotic ILI tools to perform the inspection of the unpiggable lines the pipeline operator was able to complete their reassessment obligation on an expedited timeframe gain valuable previously-unknown data about the pipeline features and validate the integrity of the pipeline.The final paper submitted for the Unpiggable Pipeline Solutions Forum 2013 will also include details and images from the inspection runs described above. 
Diakont’s US-based pipeline services group recently completed multiple inspection jobs for a western-US natural gas pipeline operator.  The sections of line required reassessment as part of the operator’s ICDA program.  For multiple reasons the lines were deemed unpiggable which necessitated the use of robotic ILI tools rather than flow-driven pigs.A video-crawler inspection conducted by the operator discovered a possible indication of internal corrosion at a low point in the line.  A neighboring line had dense internal buildup too extensive to rely upon a visual-only inspection.  Due to these preliminary findings the operator made the decision to have Diakont perform a comprehensive in-line inspection using their robotic EMAT tools and to extend the scope of the inspection beyond the original plan.Diakont conducted a high-resolution internal examination of the pipe sections using the tool’s non-contact EMAT probes.  The EMAT scan of the indication did confirm some wall loss in one of the pipe sections however it was measured to be at a minimal depth so a drip line was installed and the pipeline was returned to service.By utilizing robotic ILI tools to perform the inspection of the unpiggable lines the pipeline operator was able to complete their reassessment obligation on an expedited timeframe gain valuable previously-unknown data about the pipeline features and validate the integrity of the pipeline.The final paper submitted for the Unpiggable Pipeline Solutions Forum 2013 will also include details and images from the inspection runs described above. 
Product tags
Also Purchased
Picture for 04182 ILI Reporting for Pipeline Integrity
Available for download

04182 ILI Reporting for Pipeline Integrity Management Programs

Product Number: 51300-04182-SG
ISBN: 04182 2004 CP
Author: Martin Phillips, Daniel Soenjoto, Michiel P. Brongers, and Patrick H. Vieth, CC Technologies Inc.
$20.00
Picture for 05164 Assessment of ILI Tool Performance
Available for download

05164 Assessment of ILI Tool Performance

Product Number: 51300-05164-SG
ISBN: 05164 2005 CP
Author: Guy Desjardins, Morrison Scientific
$20.00
Picture for 03156 ILI DATA INTEGRATION: PIPELINE
Available for download

03156 ILI DATA INTEGRATION: PIPELINE INTEGRITY ANALYSIS USING MULTIPLE INSPECTION TECHNOLOGIES

Product Number: 51300-03156-SG
ISBN: 03156 2003 CP
Author: William H. Brown, Wilson Rivera
$20.00