Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

Lining Below Grade Concrete

What  exactly  is  involved  when  designing  and  installing  a  liner  for  concrete  structures below  grade?  Does  the structure  need  to  be  damp proofed?  What  testing  protocols  should or shouldn't  be  specified  and when should they  be  performed.  What  type  of  surface  prep should be done  and  why  is  surface profile  so  important?  What  type of  liner  has  the  best  performance properties  for  below  grade  concrete?  Why  liner  curing  time, thickness  and  resistance  to moisture is  important.  These are several  questions  that  should  be  answered when beginning  to specify  a lining  project 

Product Number: 51220-227-SG
Author: Matt Apsley
Publication Date: 2020
$0.00
$20.00
$20.00

What  exactly  is  involved  when  designing  and  installing  a  liner  for  concrete  structures below  grade?  Does  the structure  need  to  be  damp proofed?  What  testing  protocols  should or shouldn't  be  specified  and when should they  be  performed.  What  type  of  surface  prep should be done  and  why  is  surface profile  so  important?  What  type of  liner  has  the  best  performance properties  for  below  grade  concrete?  Why  liner  curing  time, thickness  and  resistance  to moisture is  important.  These are several  questions  that  should  be  answered when beginning  to specify  a lining  project.

What  exactly  is  involved  when  designing  and  installing  a  liner  for  concrete  structures below  grade?  Does  the structure  need  to  be  damp proofed?  What  testing  protocols  should or shouldn't  be  specified  and when should they  be  performed.  What  type  of  surface  prep should be done  and  why  is  surface profile  so  important?  What  type of  liner  has  the  best  performance properties  for  below  grade  concrete?  Why  liner  curing  time, thickness  and  resistance  to moisture is  important.  These are several  questions  that  should  be  answered when beginning  to specify  a lining  project.

Product tags
Also Purchased