Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Clearing the Hurdles' – A Look at the South Valley Sewer District, Jordan Basin WRF Membrane Basins Rehabilitation Project

The South Valley Sewer District, located outside of Salt Lake City, Utah, experienced severe degradation of the concrete substrate the Membrane Basins at the Jordan Basin WRF. The Bowen Collins & Associates designed facility initially opened for service in July of 2012. By 2017 the facility was showing significant effects of concrete deterioration from chemical attack, caused by citric acid and sodium hypochlorite used as a part of the cleaning procedures in the membrane basins. 

Product Number: 51219-192-SG
Author: Greg Hansen
Publication Date: 2019
$0.00
$20.00
$20.00

The South Valley Sewer District, located outside of Salt Lake City, Utah, experienced severe degradation of the concrete substrate the Membrane Basins at the Jordan Basin WRF. The Bowen Collins & Associates designed facility initially opened for service in July of 2012. By 2017 the facility was showing significant effects of concrete deterioration from chemical attack, caused by citric acid and sodium hypochlorite used as a part of the cleaning procedures in the membrane basins. This paper explains the background that led to the rehabilitation required; the teamwork employed by the engineer, and its corrosion consultant and select coatings manufacturers to develop rehabilitation solutions

The South Valley Sewer District, located outside of Salt Lake City, Utah, experienced severe degradation of the concrete substrate the Membrane Basins at the Jordan Basin WRF. The Bowen Collins & Associates designed facility initially opened for service in July of 2012. By 2017 the facility was showing significant effects of concrete deterioration from chemical attack, caused by citric acid and sodium hypochlorite used as a part of the cleaning procedures in the membrane basins. This paper explains the background that led to the rehabilitation required; the teamwork employed by the engineer, and its corrosion consultant and select coatings manufacturers to develop rehabilitation solutions

Also Purchased