Search
Filters
Close

Challenges Of Mitigating AC Interference Risks In A 107 Km Multi-Pipeline Corridor

This case study involves an NPS 36, 107 km long pipeline (Pipeline A) installed in 2016. The subject pipeline is collocated with an NPS 30 pipeline constructed in 1999 (Pipeline B), for the entire route, and two additional pipelines near the start of its route (Pipelines C and D), all owned by the same operator. 

Product Number: 51322-17949-SG
Author: Wolfgang Fieltsch, Paul Murray
Publication Date: 2022
$0.00
$20.00
$20.00

An initial AC interference study and mitigation design was performed prior to construction, on the subject NPS 36, 107 km long pipeline (Pipeline A) installed in 2016. The subject pipeline is collocated with an NPS 30 pipeline (Pipeline B) constructed in 1999, for the entire route, and several other pipelines in some areas, all owned by the same operator and with shared cathodic protection systems. Five areas of powerline collocation were identified and modeled in the AC Interference study. 

An initial AC interference study and mitigation design was performed prior to construction, on the subject NPS 36, 107 km long pipeline (Pipeline A) installed in 2016. The subject pipeline is collocated with an NPS 30 pipeline (Pipeline B) constructed in 1999, for the entire route, and several other pipelines in some areas, all owned by the same operator and with shared cathodic protection systems. Five areas of powerline collocation were identified and modeled in the AC Interference study. 

Also Purchased