Search
Filters
Close

Bridge Maintenance Painting in the Land of 10,000 Lakes MnDOT’s approach to Improving Bridge Maintenance Painting Operations

The Minnesota Department of Transportation (MnDOT) with KTA-Tator, Inc. (KTA) conducted a one-day seminar on Bridge Maintenance Painting Strategy & Project Design in May 2013. One outcome of that seminar was the realization that MnDOT needed a more uniform method to rate the condition of coatings statewide during the biennial bridge safety inspections and a process to select and prioritize maintenance painting strategies. MnDOT assembled a Technical Advisory Panel to address these needs and launched a multi-objective study from October 2013 through June 2014. 

Product Number: 41215-932-SG
Author: Sarah K. Sondag, Richard A. Burgess
Publication Date: 2015
Industry: Coatings
$0.00
$20.00
$20.00

The Minnesota Department of Transportation (MnDOT) with KTA-Tator, Inc. (KTA) conducted a one-day seminar on Bridge Maintenance Painting Strategy & Project Design in May 2013. One outcome of that seminar was the realization that MnDOT needed a more uniform method to rate the condition of coatings statewide during the biennial bridge safety inspections and a process to select and prioritize maintenance painting strategies. MnDOT assembled a Technical Advisory Panel to address these needs and launched a multi-objective study from October 2013 through June 2014. This paper describes the outcomes of the objectives undertaken and MnDOT’s approach to improving statewide bridge maintenance painting operations.

The Minnesota Department of Transportation (MnDOT) with KTA-Tator, Inc. (KTA) conducted a one-day seminar on Bridge Maintenance Painting Strategy & Project Design in May 2013. One outcome of that seminar was the realization that MnDOT needed a more uniform method to rate the condition of coatings statewide during the biennial bridge safety inspections and a process to select and prioritize maintenance painting strategies. MnDOT assembled a Technical Advisory Panel to address these needs and launched a multi-objective study from October 2013 through June 2014. This paper describes the outcomes of the objectives undertaken and MnDOT’s approach to improving statewide bridge maintenance painting operations.

Also Purchased