Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

99036 TOP OF LINE CORROSION IN MULTIPHASE GAS LINES. A CASE HISTORY

Product Number: 51300-99036-SG
ISBN: 99036 1999 CP
Author: Y.M. Gunaltun, D. Supriyam, J. Achmad
$0.00
$20.00
$20.00
Multiphase wet gas flow lines of Tunu field cross the Mahakam River at several locations. Even though the corrosion monitoring systems have shown negligible internal corrosion rates, inspection by intelligent pigging, after six years of service, of two of these flow lines indicated severe internal top of line corrosion (TLC). Corrosion occurred in three locations in one line and at two locations in the other one. The lengths of the corroded pipe sections vary between 10 and 100 meters. Further investigations showed that corrosion took place at locations where the pipes were in direct contact with river water. These were unburied pipe sections (doglegs or pipe sections where upheaval buckling occurred) being subject to heavy cooling and consequently heavy water condensation. A pipe portion was removed. Visual inspection and laboratory examination confirmed the proposed explanation. This paper describes in details the field operating conditions, presents the results of inspection and laboratory studies and describes remedial actions unshaken to solve the problem.

Key words: top of line corrosion wet gas line, water condensation upheaval buckling
Multiphase wet gas flow lines of Tunu field cross the Mahakam River at several locations. Even though the corrosion monitoring systems have shown negligible internal corrosion rates, inspection by intelligent pigging, after six years of service, of two of these flow lines indicated severe internal top of line corrosion (TLC). Corrosion occurred in three locations in one line and at two locations in the other one. The lengths of the corroded pipe sections vary between 10 and 100 meters. Further investigations showed that corrosion took place at locations where the pipes were in direct contact with river water. These were unburied pipe sections (doglegs or pipe sections where upheaval buckling occurred) being subject to heavy cooling and consequently heavy water condensation. A pipe portion was removed. Visual inspection and laboratory examination confirmed the proposed explanation. This paper describes in details the field operating conditions, presents the results of inspection and laboratory studies and describes remedial actions unshaken to solve the problem.

Key words: top of line corrosion wet gas line, water condensation upheaval buckling
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 00071 CORRELATION OF CASES OF TOP OF LINE
Available for download

00071 CORRELATION OF CASES OF TOP OF LINE CORROSION WITH CALCULATED WATER CONDENSATION RATES

Product Number: 51300-00071-SG
ISBN: 00071 2000 CP
Author: Y.M. Gunaltun, D. Larrey
$20.00
Picture for 01033 CONTROL OF TOP OF LINE CORROSION
Available for download

01033 CONTROL OF TOP OF LINE CORROSION BY CHEMICAL TREATMENT

Product Number: 51300-01033-SG
ISBN: 01033 2001 CP
Author: Yves M. Gunaltun, Ahmed Belghazi
$20.00
Picture for 07555 Top of Line Corrosion and Water Condensation Rates in Wet Gas Pipelines
Available for download

07555 Top of Line Corrosion and Water Condensation Rates in Wet Gas Pipelines

Product Number: 51300-07555-SG
ISBN: 07555 2007 CP
Author: Rolf Nyborg and Arne Dugstad
Publication Date: 2007
$20.00