Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

98450 FIELD CONSTRUCTION OF LARGE DIAMETER, CORROSION RESISTANT FRP EQUIPMENT

Product Number: 51300-98450-SG
ISBN: 98450 1998 CP
Author: Robert C. Hawkins
$0.00
$20.00
$20.00
New manufacturing technologies and equipment, in conjunction with construction management expertise, now allow for the use of Fiberglass Reinforced Plastic (FRP) as the construction material for process equipment as large as 80’ in diameter. FRP has provided solutions for corrosion problems for over 40 years. Now the application of the material can be extended to even larger field constructed equipment. Significant experience in this area has been gained over the past several years, and this paper will review two field winding projects. Keywords: flue gas desulphurization, limestone scrubbing, field winding, jump-form construction, chop hoop construction.
New manufacturing technologies and equipment, in conjunction with construction management expertise, now allow for the use of Fiberglass Reinforced Plastic (FRP) as the construction material for process equipment as large as 80’ in diameter. FRP has provided solutions for corrosion problems for over 40 years. Now the application of the material can be extended to even larger field constructed equipment. Significant experience in this area has been gained over the past several years, and this paper will review two field winding projects. Keywords: flue gas desulphurization, limestone scrubbing, field winding, jump-form construction, chop hoop construction.
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 08516 Replacing Corroded and Failed Metallic Pipe with Corrosion Resistant FRP Pipe, Design and Inst
Available for download

08516 Replacing Corroded and Failed Metallic Pipe with Corrosion Resistant FRP Pipe, Design and Installation Requirements and a Case History

Product Number: 51300-08516-SG
ISBN: 08516 2008 CP
Author: Robert C. Hawkins
Publication Date: 2008
$20.00
Picture for 11366 FRP Chimney Liners for Power Plant Flue Gas Desulfurization
Available for download

11366 FRP Chimney Liners for Power Plant Flue Gas Desulfurization - A Chimney Supplier's Perspective

Product Number: 51300-11366-SG
ISBN: 2011 11366 CP
Author: Victor A. Bochicchio
Publication Date: 2011
$20.00
Picture for 97349 A RECOMMENDED FRP INSPECTION PROCEDURE
Available for download

97349 A RECOMMENDED FRP INSPECTION PROCEDURE FOR THE END-USER

Product Number: 51300-97349-SG
ISBN: 97349 1997 CP
Author: Terry W. Cowley
$20.00