A contract to provide simulation trainers contained specific corrosion
control design and material requirements. The contractor requested assistance to determine how the requirements could be incorporated into the design. The contract corrosion control requirements are listed along with an interpretation of how to incorporate them into the design.
Keywords: Contract requirements, electronic design, electronic assembly, design prohibitions, material prohibitions, corrosion resistant materials.