Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

08054 Evaluation of 100 mV Development/Decay Criteria on 4 meter Diameter Prestressed Concrete Cylinder Pipeline

Product Number: 51300-08054-SG
ISBN: 08054 2008 CP
Author: Reafat Elaish, Omran Abuazza, and Khalefa Enawaa
Publication Date: 2008
$0.00
$20.00
$20.00
Sacrificial cathodic protection system was applied for protection of prestressed concrete cylinder pipe in the Great Man made River Project pipelines in Libya, where 100 mV Polarization\Decay criteria was used to evaluate the performance of the cathodic protection. Section of 2.29 km of protected pipeline that was existing between two sections of long non protected pipeline was selected for testing. All of the applicable tests were executed on the selected section before and after installation of sacrificial zinc anode system. The purpose of this study is to assess the reliability and efficiency of sacrificial CP system in the relatively high soil resistivity which has high chloride content and low moisture.
Sacrificial cathodic protection system was applied for protection of prestressed concrete cylinder pipe in the Great Man made River Project pipelines in Libya, where 100 mV Polarization\Decay criteria was used to evaluate the performance of the cathodic protection. Section of 2.29 km of protected pipeline that was existing between two sections of long non protected pipeline was selected for testing. All of the applicable tests were executed on the selected section before and after installation of sacrificial zinc anode system. The purpose of this study is to assess the reliability and efficiency of sacrificial CP system in the relatively high soil resistivity which has high chloride content and low moisture.
Product tags
Also Purchased
Picture for 08072 The Use of the 100 mV Polarization Criterion in Complex Facilities
Available for download

08072 The Use of the 100 mV Polarization Criterion in Complex Facilities

Product Number: 51300-08072-SG
ISBN: 08072 2008 CP
Author: Whitt L. Trimble
Publication Date: 2008
$20.00
Picture for 08071 Design and Construction of the Hybrid CP System for the Mexico City Airport Jet Fuel Pipeline
Available for download

08071 Design and Construction of the Hybrid CP System for the Mexico City Airport Jet Fuel Pipeline Under the 100 mV Polarization Criterion

Product Number: 51300-08071-SG
ISBN: 08071 2008 CP
Author: L. Escalera, A. Rios, H. Albaya, J. Canto, H. Carrillo, and L. Gomez
Publication Date: 2008
$20.00
Picture for 01581 ORIGIN AND VALIDATION OF THE 100 mV
Available for download

01581 ORIGIN AND VALIDATION OF THE 100 mV POLARIZATION CRITERION

Product Number: 51300-01581-SG
ISBN: 01581 2001 CP
Author: Thomas J. Barlo
$20.00