Server maintenance is scheduled for Saturday, December 21st between 6am-10am CST.

During that time, parts of our website will be affected until maintenance is completed. Thank you for your patience.

Search
Filters
Close

Use GIVING24 at checkout to save 20% on eCourses and books (some exclusions apply)!

02068 Pipeline Integrity Assessment Applied to the Conversion of a Large Diameter Natural Gas Transmission Pipeline to Liquid Products Service

Product Number: 51300-02068-SG
ISBN: 02068 2002 CP
Author: Chad J. Zamarin, Bryan P. Melan, and E. E. “Gene” Humes
$0.00
$20.00
$20.00
A major conversion project was undertaken in 2001 to convert a fifty-year-old natural gas transmission pipeline to refined petroleum products service. A joint venture Limited Liability Corporation (LLC) was formed to modify and convert the existing pipeline, as well as operate and maintain the system to transport refined liquid fuels from the Gulf Coast to the Midwestern United States. As part of the United States Federal Energy Regulatory Commission(1) (FERC) approval process, this partnership made a commitment to assure the mechanical integrity of the pipeline system prior to placing the converted line into service. The integrity of the pipeline was assessed and confirmed using several integrity assessment methods. This paper will outline the methods employed to detect and remove potentially hazardous defects prior to startup. It will discuss the metallurgical evaluation of the 1950’s vintage pipe and known integrity concerns. It will discuss the use and objectives of In Line Inspection technology, and how this technology combined with a customized hydrostatic testing protocol produced a comprehensive evaluation of the system. It will discuss the USDOT(2) Office of Pipeline Safety’s (OPS) recently enacted Integrity Management Plan rule and how this rule affected the planning and execution of the project. Finally this paper will describe the extensive amount of planning, coordination, and communication required to execute the integrity assessment of approximately 700 miles (1126 km) of fifty year old pipeline which today serves the motor fuel deficient Midwest region.
A major conversion project was undertaken in 2001 to convert a fifty-year-old natural gas transmission pipeline to refined petroleum products service. A joint venture Limited Liability Corporation (LLC) was formed to modify and convert the existing pipeline, as well as operate and maintain the system to transport refined liquid fuels from the Gulf Coast to the Midwestern United States. As part of the United States Federal Energy Regulatory Commission(1) (FERC) approval process, this partnership made a commitment to assure the mechanical integrity of the pipeline system prior to placing the converted line into service. The integrity of the pipeline was assessed and confirmed using several integrity assessment methods. This paper will outline the methods employed to detect and remove potentially hazardous defects prior to startup. It will discuss the metallurgical evaluation of the 1950’s vintage pipe and known integrity concerns. It will discuss the use and objectives of In Line Inspection technology, and how this technology combined with a customized hydrostatic testing protocol produced a comprehensive evaluation of the system. It will discuss the USDOT(2) Office of Pipeline Safety’s (OPS) recently enacted Integrity Management Plan rule and how this rule affected the planning and execution of the project. Finally this paper will describe the extensive amount of planning, coordination, and communication required to execute the integrity assessment of approximately 700 miles (1126 km) of fifty year old pipeline which today serves the motor fuel deficient Midwest region.
PRICE BREAKS - The more you buy, the more you save
Quantity
1+
5+
Price
$20.00
$20.00
Product tags
Also Purchased
Picture for 02070 Improving Pipeline Integrity Using...
Available for download

02070 Improving Pipeline Integrity Using Computer Simulation

Product Number: 51300-02070-SG
ISBN: 02070 2002 CP
Author: Robert Adey and Ernesto Santana Diaz
$20.00
Picture for 02073 RISK MINING: A PREDICTIVE TOOL TO ENHANCE...
Available for download

02073 RISK MINING: A PREDICTIVE TOOL TO ENHANCE PIPELINE INTEGRITY ASSESSMENT

Product Number: 51300-02073-SG
ISBN: 02073 2002 CP
Author: Stephen F. Biagiotti, Jr, Mark Madden, and Elaine S. Hendren
$20.00
Picture for 96052 ENHANCING PIPELINE INTEGRITY THROUGH
Available for download

96052 ENHANCING PIPELINE INTEGRITY THROUGH INTERNAL INSPECTION

Product Number: 51300-96052-SG
ISBN: 96052 1996 CP
Author: Dennis R. Turner
$20.00