Search
Filters
Close

Save 20% on select titles with code HIDDEN24 - Shop The Sale Now

51312-01505-THPS: A Review of the First 25 Years Lessons Learned Value Created and Visions for the Future

Product Number: 51312-01505-SG
ISBN: 01505 2012 CP
Author: Chris R. Jones
Publication Date: 2012
$0.00
$20.00
$20.00

Since its first application in the UK sector of the North Sea in the late 1980’s THPS has established a “best-in-class” status for the control of problematic sulphate reducing bacteria (SRB) and the operational problems associated with their metabolic activity. This paper will review how THPS technology has been developed and enhanced to meet new industry needs will compare and contrast the various different “THPS generations” currently available on the market will discuss and describe case studies and best practices for the control of reservoir souring iron sulfide schmoo and microbially influenced corrosion (MIC) and will provide insights into new control strategies applications and efficacy data against challenging new organisms such as archaea. Key Words: THPS SRB Reservoir Souring Iron Sulfide Schmoo MIC Archaea

Since its first application in the UK sector of the North Sea in the late 1980’s THPS has established a “best-in-class” status for the control of problematic sulphate reducing bacteria (SRB) and the operational problems associated with their metabolic activity. This paper will review how THPS technology has been developed and enhanced to meet new industry needs will compare and contrast the various different “THPS generations” currently available on the market will discuss and describe case studies and best practices for the control of reservoir souring iron sulfide schmoo and microbially influenced corrosion (MIC) and will provide insights into new control strategies applications and efficacy data against challenging new organisms such as archaea. Key Words: THPS SRB Reservoir Souring Iron Sulfide Schmoo MIC Archaea

Product tags
Also Purchased
Picture for 10257 Extending Performance Boundaries with Third Generation THPS Formulations
Available for download

10257 Extending Performance Boundaries with Third Generation THPS Formulations

Product Number: 51300-10257-SG
ISBN: 10257 2010 CP
Author: Brian L. Downward, Chris R. Jones, Kansas Hernandez, Francis Smith and Tim Curtis
Publication Date: 2010
$20.00
Picture for Enhanced THPS for Challenging Environments
Available for download

51316-7532-Enhanced THPS for Challenging Environments

Product Number: 51316-7532-SG
ISBN: 7532 2016 CP
Author: Stephanie Edmunds
Publication Date: 2016
$20.00
Picture for 00001 EFFECT OF ANIONS AND CATIONS ON THE PIT
Available for download

00001 EFFECT OF ANIONS AND CATIONS ON THE PIT INITIATION IN CO2 CORROSION OF IRON AND STEEL

Product Number: 51300-00001-SG
ISBN: 00001 2000 CP
Author: G. Schmitt and S. Feinen
$20.00